翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Detroit-Superior Bridge : ウィキペディア英語版
Detroit–Superior Bridge

}}
The Detroit–Superior Bridge (officially known as the Veterans Memorial Bridge) is a 3,112 foot (949 meter) long through arch bridge over the Cuyahoga River in Cleveland, Ohio. The bridge links Detroit Avenue on Cleveland's west side and Superior Avenue on Cleveland's east side, terminating west of Public Square. Construction by the King Bridge Company began in 1914 and completed in 1918, at a cost of $5.4 million. It was the first fixed high level bridge in Cleveland, and the third high level bridge above the Cuyahoga (the first was the Old Superior Viaduct and the second the Central Viaduct, also built by the King Company). At its completion, the bridge was the largest steel and concrete reinforced bridge in the world.
==Specifications==

The high level bridge starts on the east at the center line of West 9th Street and Superior, and extends across the Cuyahoga Valley to the junction of West 25th Street and Detroit Avenue. It is long. The total cost, including the land and a right of way, was $5,407,000, split as $1,687,200 was for land and $3,719,800 for the superstructure.〔Bridges of Cleveland and Cuyahoga County, 1918; THE NEW DETROIT-SUPERIOR HIGH LEVEL BRIDGE; Stanley L. McMichael; pg 7-10〕
The bridge has of clearance above the river, and rises to above the river at the peak of the central span. The original construction included a main deck wide, with two sidewalks and a roadway. While the bridge's upper level is for road traffic, the lower level was intended for streetcars. It was built with four sets of these tracks, leaving room for two more, if needed.〔
The structure includes 12 concrete arches and one steel span. The steel span is long and crosses the Cuyahoga River. The steel span cost $646,747. About of concrete and of reinforcing steel were used in the construction of the arches.〔 The concrete piles used in the foundation work, if placed end to end, would extend a distance of . Each end of the structure has underground streetcar stations for the trams that operated on the lower deck.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Detroit–Superior Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.